Anthem WRF Reclaimed Water Study

Project Owner

EPCOR Water

Location

Anthem, CA

Project Overview

Valentine performed an evaluation of the existing reclaimed water practices at the Anthem Water Reclamation Plant and Water Treatment Plant Campus.  The purpose of the evaluation was to determine alternatives to reduce discharge to Deadman’s Wash by optimizing other current means of reclaimed water use and/or creating new opportunities for reclaimed water use.

 

 

Valentine analyzed current data and practices to establish baseline operating conditions and water balance.  This allowed us to determine bottlenecks and ways to optimize current practices.   This allowed us to generate an optimized capacity of existing facilities and thus optimize the capacity for new opportunities.

Unique Water Resources Planning Features

Multi Use Reclaimed Water System

Life Cycle Cost Analysis

Water Balance