Project Owner
California American Water
Location
Carmel Valley, CA
Project Overview
This project involved rehabilitating the existing High Meadows Booster Pump Station. The existing pumps and electrical line up were beyond their useful life, in addition the existing pumps were undersized to accommodate future water demand and fire flow. Valentine reviewed options for pump station rehabilitation that maintained the existing booster pump station in service and did not require a second suction connection to the existing storage tank. Valentine also coordinated with PGE to upgrade the electrical service to the site. Valentine provided concept design, hydraulic modeling, detailed design, construction administration and permitting.
Key Project Features
Rehabilitation
Maintaining Service During Construction
New Power Supply Coordination
Hydraulic Modeling