Well Site 140 Aquifer Storage and Recovery Well

Client: City of Scottsdale

Location: Scottsdale, Arizona

Components:

  • Well site design
  • Preliminary site layouts
  • Well pump design
  • Overall system hydraulic analysis
  • Recovery well discharge piping and appurtenances
  • Injection piping with flow meter and sleeve valve to reduce the incoming pressure to a low pressure suitable for deep-well injection
  • Discharge holding tank
  • Associated pumping system for controlled discharge to the sewer
  • Well site support systems design
  • Site civil design
  • Native plant inventory, landscaping design, and aesthetic perimeter wall
  • Additional direct injection and recovery well, Well Site 140, to the City’s water distribution and supply system
  • Well Site No. 140 was designed, constructed, and outfitted in preparation for deep-well injection and recovery
  • Operated remotely and connected to the City’s SCADA system
  • Hydrogeologic services including a site characterization study, well permitting, well drilling bid document preparation, logging, water quality sampling, flow testing and monitoring well design

Services Provided:

  • Design
Loading Images
wpif2_loading
Decorative Wall
Well Head Piping
Pump Waste Tank