La Palma Water Campus

Client:  Corrections Corporation of America

Location:  La Palma, CA

Components:

  • Design of water production facility which included a 250 GPM recovery well with on site storage, arsenic treatment and disinfection
  • Design of the well pump, well outfitting, site civil design, arsenic treatment system, chlorine gas disinfection system, and above grade 550,000 gallon steel reservoir
  • Hydraulic analyses to determine well pump design criteria and utilized WATERCAD software for overall water distribution system modeling.
  • Coordinated with subconsultant for hydro-geological services including well drilling permitting, well bid documents, logging, water quality sampling and flow testing

Services Provided:

  • Design
  • Construction administration
  • Inspection
  • Permitting
Loading Images
wpif2_loading
La Palma Water Campus
Well Pump and Well Head Piping
Booster Pumps
Arsenic Treatment System