Verrado Zone 3 Reservoir No. 2

Client:  EPCOR

Location:  Verrado, AZ

Components:

  • 1.3 million gallon pre-stressed post-tensioned circular tank (DYK)
  • Piping to existing booster pump station.

Services Provided:

  • Design
  • Construction Administration & Inspection Services
  • Permitting
Loading Images
wpif2_loading
Internal Reservoir Columns
Completed Reservoir Before Backfill
P1011048
P5020134
Reservoir Under Construction
P8030158
P8080172
P8080174
P8080175
P8080179
P8220007
Reservoir Under Construction
P8220009