Wishing Well WRF Improvements

Owner:  EPCOR

Location: Fort Mojave, AZ

See Turbo Blower Case Study

 

Components:

  • Study, design and permitting services for facility improvements to the Wishing Well Water Reclamation Facility (WRF)
  • Site master plan which included a plant capacity analysis – identified that the existing activated sludge basin was capable of treating up to double its rated capacity
  • Cost savings enabled plan for other needed facility improvements
  • New headworks consisting of grit chamber, fine screening and flow monitoring
  • Retrofit of existing aeration system from coarse bubble to fine bubble
  • Replacement of existing multi-stage blowers with high efficiency turbo blowers
  • Conversion of existing clarifier to sludge storage
  • Installation of 3 new clarifiers
  • Addition of solids screw press for sludge dewatering

Services Provided:

  • Design
  • Construction administration
Loading Images
wpif2_loading
Influent Screen
Solids Dewatering
Sludge Screw Press
Secondary Clarifier
Turbo Blower